Important Notice Regarding the Arch Bridge on the LAGA Grounds in the Direction of the Weiße Dame/Bürgerhalle!
The city administration notes that the planks of the arched bridge will be recoated from June 10 through July 19. During the first phase of construction, the planks in the ramp area near the “Weiße Dame” will be renovated, and this area will be completely closed off. However, pedestrians can still access the bridge via the stairways. An accessible detour is available via the underpass at the train station.